Final | 10/12/2009 | 10/13/2009 | 10/13/2009 | A | PASS |
Bob Reichert
|
|
|
mike Phone #: ###-#### called contractor , ok to final
|
Electrical Rough-In | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | PASS |
Bob Reichert
|
|
|
mike Phone #: ###-#### pool light potting only ok
|
Electrical Rough-In | 9/21/2009 | 9/21/2009 | 9/21/2009 | P | PASS |
Doug A Poedy
|
|
|
Mike-conduit bonding inspection please Phone #: ###-####. Pool bonding and underground good.
|