Final | 11/18/2009 | 11/18/2009 | 11/18/2009 | P | PASS |
Doug A Poedy
|
|
|
service riser repaired Phone #: ###-#### Internet Inspection Request from: Joe Thomas
|
DOC - Permit Finaled | 11/18/2009 | 11/18/2009 | 11/18/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | FAIL |
Doug A Poedy
|
|
|
Phone #: ###-#### Internet Inspection Request from: Joe Thomas 230.50 Underground service entrance conductors shall be protected.
|
Electrical Rough-In | 10/5/2009 | 10/6/2009 | 10/6/2009 | A | PASS |
Doug A Poedy
|
|
|
Need remainder of cover. Spoke with Doug to confirm load calc. Original cover excluded around panels in case of changes. We will schedule with Idaho Power to fix service riser. Phone #: ###-#### Internet Inspection Request from: Joe Thomas. Ok to cover the rest.
|
Electrical Rough-In | 9/25/2009 | 9/28/2009 | 9/28/2009 | P | PART |
Doug A Poedy
|
|
|
Service existing, added 1 sub panel in garage. 2nd floor was selective remodel. Basement and main floor were mostly complete remodel. Phone #: ###-#### Internet Inspection Request from: Joe Thomas. Ok to cover all but around sub panels. Waiting for load calc. from Joe.
|