Final | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PASS |
Doug A Poedy
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jenni Keller. ok final.
|
DOC - Permit Finaled | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 10/6/2009 | 10/6/2009 | 10/6/2009 | A | CANC |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jenni Keller corrections made, ric ok, no esc this project
|
Electrical Rough-In | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | CANC |
Bob Reichert
|
|
|
Re Inspect Phone #: ###-#### Internet Inspection Request from: Jenni Keller Inspection cancelled from web by: Jenni Keller Inspection cancelled from web by: Jenni Keller
|
Electrical Rough-In | 9/29/2009 | 9/30/2009 | 9/30/2009 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jenni Keller called, lef tcorrection notice, NEC 110.12(B) box shall not be damaged or broken, 250.86 metal enclosure shall be connected to the equipment grounding conductor, no esc this project
|