Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Bob Reichert
|
|
|
Susann Phone #: ###-#### install ok, ok to final, no esc this project
|
Conference | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | DONE |
Bob Reichert
|
|
|
Suzanne Chetwood ###-#### talked about requirements to hook up hot tub in back yard, grounding, bonding, raceways, wiring, access to tub, disconnect, convenience receptacle, in-use cover. Hot tub is listed. Kiln installation is ok. No esc this project.
|