Final | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PASS |
Doug A Poedy
|
|
|
Eric Phone #: ###-####
|
Final | 12/24/2009 | 12/28/2009 | 12/28/2009 | A | FAIL |
Doug A Poedy
|
|
|
Eric Phone #: ###-####. NEC 210.8 Garage gfci
|
Electrical Rough-In | 11/25/2009 | 11/27/2009 | 11/27/2009 | A | PASS |
Doug A Poedy
|
|
|
Eric Phone #: ###-####
|
Electrical Rough-In | 11/24/2009 | 11/25/2009 | 11/25/2009 | A | NR |
Doug A Poedy
|
|
|
ERIC Phone #: ###-####. Changed into conference. Told him about strapping, disconnects, nail plates, and make up.
|
Conference | 11/16/2009 | 11/23/2009 | 11/23/2009 | A | DONE |
Doug A Poedy
|
|
|
Eric Phone #: ###-####
|
Conference | 10/23/2009 | 10/26/2009 | 10/26/2009 | P | DONE |
Doug A Poedy
|
|
|
Eric Gillet ###-####
|
Electrical Rough-In | 10/26/2009 | 10/26/2009 | 10/26/2009 | P | PASS |
Doug A Poedy
|
|
|
underground ok to cover.
|