Electrical Rough-In | 10/14/2009 | 10/15/2009 | 10/15/2009 | A | PASS |
Bob Reichert
|
|
|
Wired 3 new 120 volt receptacles on one circuit inside the new phone cabinet for QWEST. Thanks, Brian. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ric ok, see final, no esc this project
|
Final | 10/15/2009 | 10/15/2009 | 10/15/2009 | A | PASS |
Bob Reichert
|
|
|
Wired 3 new 120 volt receptacles on one circuit inside the new phone cabinet for QWEST. Thanks, Brian. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final, no esc this project
|