Final | 12/2/2009 | 12/2/2009 | 12/2/2009 | P | PASS |
Bob Reichert
|
|
|
Chuck Phone #: ###-#### ok to final, no esc this project
|
Electrical Rough-In | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Doug A Poedy
|
|
|
Tom Phone #: ###-####. Ok to cover.
|
Electrical Rough-In | 10/20/2009 | 10/21/2009 | 10/21/2009 | A | FAIL |
Bob Reichert
|
|
|
Tom Phone #: ###-#### called, left correction notice, BCC all commercial wiring shall be in mc cable or conduit and wire- no nm cable, no esc this project
|