Final | 2/19/2010 | 2/22/2010 | 2/22/2010 | A | PASS |
Jack Frank
|
|
|
Please call Dave at number above if door is not unlocked. Thank You. Inspection requested from web by: Scott Abbott Phone #: ###-#### ok
|
Final | 2/17/2010 | 2/18/2010 | 2/18/2010 | P | FAIL |
Jack Frank
|
|
|
PLEASE CALL DAVE AT NUMBER ABOVE IF YOU HAVE ANY TROUBLE GAINING ACCESS. DOOR SHOULD BE UNLOCKED. Inspection requested from web by: Scott Abbott Phone #: ###-#### needs GEC to water from p/s and x former, bushings for 4 and larger, plastic conn for GEC, and #4 for all 200 amp bonding
|
Permanent Service | 1/25/2010 | 1/26/2010 | 1/26/2010 | A | PASS |
Bob Reichert
|
|
|
Meter base was changed since service was approved so need new inspection and sticker for IPCO connect. Phone #: ###-#### Internet Inspection Request from: Scott Abbott new meter base, p/s o/h n ok, no esc this project
|
Rough-In Permanent Service | 1/15/2010 | 1/19/2010 | 1/19/2010 | A | CANC |
Bob Reichert
|
|
|
Please call Dave at ###-#### for location and key to unlock the door Phone #: ###-#### Internet Inspection Request from: Scott Abbott see p/s, no esc this project
|
Permanent Service | 1/19/2010 | 1/19/2010 | 1/19/2010 | A | PASS |
Bob Reichert
|
|
|
Please call Dave at ###-#### for location and key to unlock the door Phone #: ###-#### Internet Inspection Request from: Scott Abbott p/s o/h n ok, no esc this project
|
Conference | 12/29/2009 | 12/30/2009 | 12/30/2009 | A | DONE |
Bob Reichert
|
|
|
We will have cans hung on wall and would like to consult with you do to tight clearances could you please call Danny Smith at ###-#### with a time to meet you Phone #: ###-#### Internet Inspection Request from: Scott Abbott reviewed clearance for electrical equipment, said ok to mount surge protector and voltage protector over tansformer and service gear as required, no esc this project
|
Electrical Rough-In | 10/28/2009 | 10/30/2009 | 10/30/2009 | A | PASS |
Bob Reichert
|
|
|
underground uffer and pvc to pump concrete schudule to pour Monday Phone #: ###-#### Internet Inspection Request from: Scott Abbott called contractor, ok to pour, u/g at pad ok to pour, no esc this project
|