Final | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PASS |
Bob Reichert
|
|
|
Jim Phone #: ###-#### ok to final, no esc this project
|
Electrical Rough-In | 11/10/2009 | 11/12/2009 | 11/12/2009 | A | PASS |
Bob Reichert
|
|
|
Jim Phone #: ###-#### corrections made, walls only ok to cover, no esc this project
|
Electrical Rough-In | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | FAIL |
Bob Reichert
|
|
|
jim Phone #: ###-#### called left correction notice, NEC 300.14 shall provide 6" free conductor length, 330.30(B) shall secure mc cable within 12" of box, 300.4(A)&(D) edge of hole and edge of cable shall be 1 1/4" from edge of framing member BCC shall not secure wiring in valley of framing member, metal studs, shall make corrections within 2 weeks
|