ELE-Aging Inspection | 6/17/2010 | 6/17/2010 | 6/18/2010 | | DONE |
Bob Reichert
|
|
|
see final
|
Final | 6/18/2010 | 6/18/2010 | 6/18/2010 | A | PASS |
Bob Reichert
|
|
|
ok to final
|
Permanent Service | 1/5/2010 | 1/5/2010 | 1/5/2010 | P | PASS |
Bob Reichert
|
|
|
GUY ###-#### p/s u/g n ok, 1 meter only, no esc this project
|
Permanent Service | 1/4/2010 | 1/5/2010 | 1/5/2010 | P | FAIL |
Bob Reichert
|
|
|
Guy Phone #: ###-#### met electrican, left correction notice, NEC 110.26(F)(2) outdoor working clearance shall include the zone described in 110.26(A). No appurtances shall be located in this zone, inspection was recalled for pm after 7:30
|
Conference | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | DONE |
Bob Reichert
|
|
|
met 412 and 414, reviewed service requirements for new cell tower going up, no esc this project
|
Conference | 12/4/2009 | 12/7/2009 | 12/7/2009 | P | DONE |
Mike Kinnear
|
|
|
guy - 1:30 apt Phone #: ###-#### the service shall comply with the NEC 230.2
|
Conference | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | DONE |
Doug A Poedy
|
|
|
Had conference with contractor, MKinnear, and Bob R. Discussed services not grouped. Conclusion was to have building structure seperated with new address.
|
Permanent Service | 12/3/2009 | 12/4/2009 | 12/4/2009 | P | FAIL |
Bob Reichert
|
|
|
Guy Phone #: ###-#### met contractor early, looked at part of installation, talked with 412, told contractor only 1 service allowed for building per NEC 230, no esc this project
|