Electrical Rough-In | 1/6/2010 | 1/6/2010 | 1/6/2010 | A | PASS |
Jack Frank
|
|
|
please inspect above ceiling for cover. also ready for final. please inspect any time today, no rush. panel cover is off only to allow framers to build a fur around the panel can. Thanks Phone #: ###-#### Internet Inspection Request from: Loren Ramsey ok
|
Final | 1/6/2010 | 1/6/2010 | 1/6/2010 | A | PASS |
Jack Frank
|
|
|
please inspect above ceiling for cover. also ready for final. please inspect any time today, no rush. panel cover is off only to allow framers to build a fur around the panel can. Thanks Phone #: ###-#### Internet Inspection Request from: Loren Ramsey ok no card
|
Electrical Rough-In | 12/6/2009 | 12/7/2009 | 12/7/2009 | A | PASS |
Doug A Poedy
|
|
|
Call Loren at ###-#### if needed. Will be at MH Air Force Base so leave message if needed. TI is on 2nd floor, north side of building. Thank you Phone #: ###-#### Internet Inspection Request from: Loren Ramsey. Ok to cover walls.
|