Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE09-02428
StatusFinaled
Name REEDY GABRIEL
Site Address 3366 E SWEETWATER DR
Project Name 
Customer Number 
ePlanReview 
Description
basement only
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/24/20152/25/20152/25/2015APASS
DetailsBob Reichert
Gabrial Phone #: ###-#### called to change out gfci left of sink, ok final
Final2/18/20152/19/20152/19/2015AFAIL
DetailsBob Reichert
Please call ahead for access, 20 min, coming from work - Gabriel Phone #: ###-#### shall madd arc fault protection for bedrooms, and fix gfci in kitchen area, will call back in 1 week
ELE-Aging Inspection1/15/20151/15/20151/15/2015 DONE
DetailsCevyn Recla
Knocked on door, posted correction notice, 1-15-15 1:45 pm
ELE-Aging Inspection10/16/201410/16/201410/17/2014 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection7/17/20147/17/20147/21/2014 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection4/17/20144/17/20144/21/2014 DONE
DetailsBob Reichert
still under construction, called owner, told we need to final job, he has to install receptacle, then will call for inspection
ELE-Aging Inspection1/16/20141/16/20141/17/2014 DONE
DetailsBob Reichert
still under construction, owner will not call for final
ELE-Aging Inspection10/17/201310/17/201310/17/2013 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection7/18/20137/18/20137/22/2013 CANC
DetailsBob Reichert
ELE-Aging Inspection4/9/20134/9/20134/9/2013 DONE
DetailsBob Reichert
called, owner will try for final next month
ELE-Aging Inspection1/8/20131/8/20131/8/2013 DONE
DetailsBob Reichert
waiting for call back, still under construction
ELE-Aging Inspection10/9/201210/9/201210/10/2012 DONE
DetailsBob Reichert
called, left message
ELE-Aging Inspection7/10/20127/10/20127/13/2012 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection4/10/20124/10/20124/10/2012 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection1/10/20121/10/20121/12/2012 DONE
DetailsBob Reichert
called, still under construction, will call after hot tub connected
ELE-Aging Inspection9/13/20119/13/20119/14/2011 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection6/14/20116/14/20116/15/2011 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection3/15/20113/15/20113/16/2011 DONE
DetailsBob Reichert
still under construction
ELE-Aging Inspection1/11/20111/11/20111/11/2011 DONE
DetailsBob Reichert
suc
ELE-Aging Inspection11/10/201011/10/201011/10/2010 DONE
DetailsBob Reichert
suc
Electrical Rough-In6/21/20106/22/20106/22/2010APASS
DetailsBob Reichert
Gabriel Reedy-Please call at least 30 mins prior to inspection Phone #: ###-#### corrections made, ric ok lower level
Electrical Rough-In6/3/20106/7/20106/7/2010AFAIL
DetailsJack Frank
gabriel Phone #: ###-#### met owner explained what is required, shall address laundry and bathroom circuits and recepts, outlet spacing both bed rms, also for fixed panel of slider, spa dissconnect too high, shall complete all makeup
Conference12/21/200912/21/200912/21/2009PDONE
DetailsBob Reichert
Gaberiel Phone #: ###-#### met owner, talked about requirements to wire basement, told to be sure to read wiring books, reviewed outlet spacing , ri, final, make-up , 1 1/4", etc
Conference12/18/200912/21/200912/21/2009ACANC
DetailsBob Reichert
Gabriel ###-#### owner did not show 2 times, told to reschedule when he will be there, also told to get permit grouped with other permits