Final | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: Barbara Szurgot Phone #: ###-#### ok to final
|
Final | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | NH |
Doug A Poedy
|
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot
|
Electrical Rough-In | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PASS |
Jack Frank
|
|
|
Floor heat inspection Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot ok called contr shall follow all manufactures instructions for fllor heat he will install as instructions state before cover
|
Electrical Rough-In | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot ok
|
Final | 12/18/2009 | 12/21/2009 | 12/21/2009 | A | NR |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot see added r/i
|
Electrical Rough-In | 12/21/2009 | 12/21/2009 | 12/21/2009 | A | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot corr. called needs nail plates, outlet for wall space new wall old part of house, box needed for ceiling fan note will need inspection for floor heat when ready
|