Final | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | PASS |
Bob Reichert
|
|
|
Tony Phone #: ###-#### corrections made, ok to final, signed occupancy card, no esc this project
|
Final | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | FAIL |
Bob Reichert
|
|
|
Tony ###-#### called contractor, told to finish job by installing missing covers, tighten receptacles, provide gfci by sink, check listings on equipment, post occupancy card, provide panel schedule, provide correct switch plates, no esc this project, will recall
|
Electrical Rough-In | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | PASS |
Bob Reichert
|
|
|
tony Phone #: ###-#### corrections made, ric ok, no esc this project
|
Electrical Rough-In | 2/23/2010 | 2/24/2010 | 2/24/2010 | A | FAIL |
Bob Reichert
|
|
|
tony ###-#### called, left message, left correction notice, NEC 330.30(B) mc shall be secured within 12" of box, 300.4(A)(D) edge of holes and cable shall be 1 1/4" from edge of framing members,BCC shall not secure cable inside valley steel stud, shall terminate cable in box NOTE shall make corrections within 5 working days or further action will be taken
|
Electrical Rough-In | 12/21/2009 | 12/22/2009 | 12/22/2009 | P | CANC |
Bob Reichert
|
|
|
Tony Phone #: ###-#### called in for am, done in am, no esc this project
|
Electrical Rough-In | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PASS |
Bob Reichert
|
|
|
TONY Phone #: ###-#### hard lids and walls ok to cover, no esc this project
|