Final | 4/20/2010 | 4/20/2010 | 4/20/2010 | P | PASS |
Doug A Poedy
|
|
|
Jimmy Inspection requested from web by: Dave Friend Phone #: ###-####
|
DOC - Permit Finaled | 4/20/2010 | 4/20/2010 | 4/20/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 4/14/2010 | 4/15/2010 | 4/15/2010 | A | PART |
Bob Reichert
|
|
|
Call 30 minutes prior to inspection so Jimmy can meet you. Inspection requested from web by: Dave Friend Phone #: ###-#### will move 3rd elevator disconnect fom under piping per NEC 110.26 (F) and call back, no esc this project
|
Final | 4/13/2010 | 4/14/2010 | 4/14/2010 | A | CANC |
Bob Reichert
|
|
|
Jimmy Looney Inspection requested from web by: Dave Friend Phone #: ###-#### called, contractor out of town, will recall
|
Electrical Rough-In | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | PART |
Doug A Poedy
|
|
|
Main lobby elevator lights, gfci receptacles, and main controls on that elevator ok final. 2 more elevators future.
|
Electrical Rough-In | 1/13/2010 | 1/14/2010 | 1/14/2010 | A | CANC |
Doug A Poedy
|
|
|
Jeff Pierce. Please call Jeff 2 hrs prior to inspection so may meet you at job site. Site is a secured site and requires Jeff to be there to gain access. Phone #: ###-#### Internet Inspection Request from: Dave Friend. Rescheduled to afternoon.
|
Final | 1/13/2010 | 1/14/2010 | 1/13/2010 | A | CANC |
Doug A Poedy
|
|
|
Jeff Pierce Phone #: ###-#### Internet Inspection Request from: Dave Friend -- partial only Inspection cancelled from web by: Dave Friend
|