Final | 2/4/2010 | 2/5/2010 | 2/5/2010 | A | PASS |
Bob Reichert
|
|
|
labeled breaker correctly - all power works on existing reception wall. Phone #: ###-#### Internet Inspection Request from: Andy Rose corrections made, ok to final,signed card, no esc this project
|
Final | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | FAIL |
Bob Reichert
|
|
|
final on office wiring, any questioons call Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose called, left correction notice, NEC 110.3(B) equipment shall be installed per instructions and operate- receptacles in existing walls, NOTE: corrections shall be made within 5 working days or further action will be taken, no esc this project
|
Electrical Rough-In | 1/22/2010 | 1/25/2010 | 1/25/2010 | A | PASS |
Jack Frank
|
|
|
rough in inspection for outlets in office plus inspection for outlet wiring in shop area. Call Mark @ ###-#### for time to het into building, Any questions about wiring call Andy @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose ok
|