Final | 2/1/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Doug A Poedy
|
|
|
My journeyman supported the conduit, liquid tight flex, installed plastic grommet for ground wire and covered Id. power conduit with concrete. Phone #: ###-#### Internet Inspection Request from: Todd Alder
|
Temporary Service | 2/2/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Doug A Poedy
|
|
|
My journeyman supported the conduit, liquid tight flex, installed plastic grommet for ground wire and covered Id. power conduit with concrete. Phone #: ###-#### Internet Inspection Request from: Todd Alder. T/S U/G Connect ok.
|
Final | 1/29/2010 | 1/29/2010 | 1/29/2010 | P | NR |
Doug A Poedy
|
|
|
Temporary service is installed and ready for final inspection. Call Russell at ###-#### if you have questions. Phone #: ###-#### Internet Inspection Request from: Todd Alder
|
Conference | 1/29/2010 | 1/29/2010 | 1/29/2010 | P | DONE |
Doug A Poedy
|
|
|
Temporary service is installed and ready for final inspection. Call Russell at ###-#### if you have questions. Phone #: ###-#### Internet Inspection Request from: Todd Alder. Called and notified of many corrections needed to be made.
|