Final | 4/12/2010 | 4/13/2010 | 4/13/2010 | P | PASS |
Jack Frank
|
|
|
Final inspection on pool Inspection requested from web by: Lynn Cable Phone #: ###-####
|
Electrical Rough-In | 3/17/2010 | 3/18/2010 | 3/18/2010 | A | PASS |
Doug A Poedy
|
|
|
Potting Compound on swimming pool Inspection requested from web by: Lynn Cable Phone #: ###-####
|
Electrical Rough-In | 1/28/2010 | 1/29/2010 | 1/29/2010 | A | PASS |
Jack Frank
|
|
|
Pool Bonding & Underground Can you please call me first thing in the morning and let me know what time you will make it. Pool builder is wanting to shoot tomorrow and would like to know when concrete can be scheduled. Thanks Phone #: ###-#### Internet Inspection Request from: Lynn Cable pool bond and u/g ok
|