Final | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PASS |
Bob Reichert
|
|
|
corey Phone #: ###-#### found sticker, ok to final, signed occupancy card, no esc this project
|
Final | 3/1/2010 | 3/1/2010 | 3/1/2010 | P | FAIL |
Bob Reichert
|
|
|
corey Phone #: ###-#### ok to final, no esc this project called, left correction notice, BCC 4-05-33(A)(B) all equipment shall be listed by a nationally recognized testing laboratory, NOTE corrections shall be made within 10 working days or further action will be taken
|
Electrical Rough-In | 2/17/2010 | 2/17/2010 | 2/17/2010 | P | PASS |
Bob Reichert
|
|
|
dan Phone #: ###-#### ok to cover ceilings, no esc this project
|
Electrical Rough-In | 2/3/2010 | 2/4/2010 | 2/4/2010 | A | PASS |
Bob Reichert
|
|
|
door will be unlocked after 9:30 am call if possible Cory at ###-#### Phone #: ###-#### Internet Inspection Request from: cory carman corrections made, ok to cover walls only, no esc this project
|
Electrical Rough-In | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: cory carman called, left correction notice, NEC 517.13(B) switches shall be wired with mc cable with sheath qualifying as an equipment grounding conductor (receptacles also), 300.4(A)&(D) edge of bored holes and cables shall be 1 1/4" from edge of framing members, NOTE corrections shall be made within 5 working days or further action will be taken, no esc this project
|