Final | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | PASS |
Jack Frank
|
|
|
this is a vanilla shell i put power to the panel and reenergized the existing lights and heat. only new wiring was the restrooms and exits this job is ready this morning any time. thanks Inspection requested from web by: Don Lustig Phone #: ###-#### ok card signed
|
Electrical Rough-In | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Jack Frank
|
|
|
restrooms wall ceiling cover Inspection requested from web by: Don Lustig Phone #: ###-#### ok
|
Rough-In Permanent Service | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Doug A Poedy
|
|
|
Phone #: ###-#### Internet Inspection Request from: Don Lustig. P/S Connect ok. Must have placards at final.
|