Final | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | PASS |
Bob Reichert
|
|
|
key above side door Inspection requested from web by: Chris Berthelot Phone #: ###-#### corrections made, ok to final
|
Final | 3/25/2010 | 3/26/2010 | 3/26/2010 | A | NH |
Bob Reichert
|
|
|
Inspection requested from web by: Chris Berthelot Phone #: ###-#### called, left message, fee due, left card
|
Final | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | FAIL |
Jack Frank
|
|
|
Inspection requested from web by: Chris Berthelot Phone #: ###-#### correction, 410.2&16 needs required clearence for closet fixtures and install shelves in closets called
|
Electrical Rough-In | 2/22/2010 | 2/22/2010 | 2/22/2010 | P | PASS |
Bob Reichert
|
|
|
Chris- garage Phone #: ###-#### ric ok garage only
|
Rough-In Permanent Service | 2/8/2010 | 2/9/2010 | 2/9/2010 | A | PASS |
Bob Reichert
|
|
|
CHRIS Phone #: ###-#### corrections made, called for survey receptacle in dining room, and label service disconnects, ric ok, p/s u/g n ok
|
Electrical Rough-In | 2/5/2010 | 2/5/2010 | 2/8/2010 | P | FAIL |
Bob Reichert
|
|
|
Chris-Late this afternoon please Phone #: ###-#### called, left message, left correction notice, NECn300.4(A) edge of bored holes shall be 1 1/4" from edge of framing members, 314.20 boxes shall be flush with finished surface on outside, BCC shall install boxes and panel before cover, shall see u/g before cover, NOTE: corrections shall be msde in 5 working days or further action will be taken
|