Final | 4/28/2010 | 4/29/2010 | 4/29/2010 | A | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: Barbara Szurgot Phone #: ###-#### ok to final, signed card, no esc this project
|
Electrical Rough-In | 4/26/2010 | 4/27/2010 | 4/27/2010 | P | PASS |
Bob Reichert
|
|
|
Rough in 2 added offices. Call Doug to get in at ###-#### Inspection requested from web by: Barbara Szurgot Phone #: ###-#### walls only ok for 2 new offices, no esc this project
|
Electrical Rough-In | 4/8/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Bob Reichert
|
|
|
Partial ceiling inspection Inspection requested from web by: Barbara Szurgot Phone #: ###-#### ok to cover ceilings, no esc this project
|
Electrical Rough-In | 3/15/2010 | 3/16/2010 | 3/16/2010 | P | PASS |
Bob Reichert
|
|
|
Rough in inspection of interior walls Tues. aft. Doug will be on job site - ###-#### Inspection requested from web by: Barbara Szurgot Phone #: ###-#### walls only, 3rd floor only ok to cover, no esc this project
|
Conference | 3/9/2010 | 3/10/2010 | 3/10/2010 | A | DONE |
Bob Reichert
|
|
|
Contact Doug at ###-#### to let you into building. He will be on job site. Inspection requested from web by: Barbara Szurgot Phone #: ###-#### talked about plenum wiring, no esc this project
|