Final | 6/14/2010 | 6/14/2010 | 6/14/2010 | A | PASS |
Bob Reichert
|
|
|
If you cant access the space through the North entrance they should let you in through the South. Inspection requested from web by: Dan Hardisty Phone #: ###-#### called, ok to final, further work will require new permit, no card to sign sinnce this vanilla finish
|
Electrical Rough-In | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | PASS |
Jack Frank
|
|
|
The receptionist will let you in. If you have any entry problems please call Bob at the above number. Inspection requested from web by: Dan Hardisty Phone #: ###-####
|
Electrical Rough-In | 5/3/2010 | 5/3/2010 | 5/3/2010 | A | PART |
Jack Frank
|
|
|
This is a partial rough-in for 1 wall in the break room. Inspection requested from web by: Dan Hardisty Phone #: ###-#### wall in training rm ok
|
Final | 4/20/2010 | 4/21/2010 | 4/21/2010 | A | PART |
Jack Frank
|
|
|
Bob-Temp occupancy inspection please Phone #: ###-#### t/o for S W area
|
Electrical Rough-In | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PART |
Jack Frank
|
|
|
bob - as soon as possible - please call for access Phone #: ###-#### 2 new walls only
|