Final | 4/30/2010 | 5/3/2010 | 5/3/2010 | A | PASS |
Bob Reichert
|
|
|
rocky - around 10 if possible Phone #: ###-#### called, ok to final, signed card
|
Permanent Service | 4/22/2010 | 4/22/2010 | 4/22/2010 | P | PASS |
Bob Reichert
|
|
|
Rocky Phone #: ###-#### p/s o/h n ok, no esc this project
|
Final | 3/18/2010 | 3/18/2010 | 3/18/2010 | P | CANC |
Bob Reichert
|
|
|
rocky - please call 1/2 hr prior Phone #: ###-#### wrong type request, see conference
|
Conference | 3/18/2010 | 3/18/2010 | 3/18/2010 | P | DONE |
Bob Reichert
|
|
|
rocky - please call 1/2 hr prior Phone #: ###-#### talked about service, grounding, equipment layout
|
Electrical Rough-In | 3/11/2010 | 3/12/2010 | 3/12/2010 | A | PART |
Bob Reichert
|
|
|
rocky Phone #: ###-#### corrections made, walls only ok to cover except for electrical room
|
Electrical Rough-In | 3/11/2010 | 3/11/2010 | 3/11/2010 | P | FAIL |
Bob Reichert
|
|
|
Rocky Phone #: ###-#### corrections not made, fee due, check connectors, open ko in box, 1 1/4"
|
Electrical Rough-In | 3/10/2010 | 3/11/2010 | 3/11/2010 | A | FAIL |
Bob Reichert
|
|
|
rocky Phone #: ###-#### met contractor, gave corrections for 1 1/4", use mc cable terminations, add ground screws in boxes, shall provide abrasion protection for low voltage in metal studs, no esc this project
|
Electrical Rough-In | 3/10/2010 | 3/10/2010 | 3/10/2010 | P | NR |
Bob Reichert
|
|
|
Rocky Phone #: ###-#### called, left message, fee due
|