ELE-Aging Inspection | 10/19/2011 | 10/19/2011 | 10/26/2011 | | DONE |
Daryl DeGrange
|
|
|
see final
|
Final | 10/26/2011 | 10/26/2011 | 10/26/2011 | P | PASS |
Daryl DeGrange
|
|
|
final ok corrections done
|
Final | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | CANC |
Daryl DeGrange
|
|
|
removeable access cover installed to provide required working clearances
|
ELE-Aging Inspection | 6/10/2011 | 6/10/2011 | 6/10/2011 | | DONE |
Daryl DeGrange
|
|
|
still under construction
|
ELE-Aging Inspection | 3/11/2011 | 3/11/2011 | 3/17/2011 | | DONE |
Daryl DeGrange
|
|
|
elect contractor said they would call for final
|
Electrical Rough-In | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | FAIL |
Bob Reichert
|
|
|
Please call louis for gate code ###-#### Inspection requested from web by: Louis Keller Phone #: ###-#### met contractor, left correction notice, NEC 110.26 shall provide minimum 3' work space in front of panel, 314.29 shall provide accessibility to conduit body, no esc this project, NOTE: corrections shall be made in 5 working days or further action will be taken such as removal of power
|