Final | 6/8/2010 | 6/9/2010 | 6/9/2010 | A | PASS |
Bob Reichert
|
|
|
Please call first for lock box code. final service and downstairs repairs. Inspection requested from web by: Steve Ruter Phone #: ###-#### called, ok to final
|
Permanent Service | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | PASS |
Bob Reichert
|
|
|
Please call before coming out. I have cordinated shut down with Idaho Power at 9:00 am and will need a later afternoon inspection to re-enegize panel. Thank You Inspection requested from web by: Steve Ruter Phone #: ###-#### p/s o/h rec ok, no esc this project
|
Electrical Rough-In | 4/1/2010 | 4/2/2010 | 4/2/2010 | A | PASS |
Bob Reichert
|
|
|
Please call first for the lock box code. If you cannot reach me call Stan @###-#### **Temp panel feeders will be removed on Tuesday. I had to give them temp power before I could do the service change. Inspection requested from web by: Steve Ruter Phone #: ###-#### ric ok, no esc this project
|