Final | 4/29/2010 | 4/30/2010 | 4/30/2010 | A | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: John VanZandt Phone #: ###-#### ok to final, no esc
|
Electrical Rough-In | 4/13/2010 | 4/14/2010 | 4/14/2010 | A | PASS |
Bob Reichert
|
|
|
Please call 30 minutes before. Inspection requested from web by: John VanZandt Phone #: ###-#### corrections made, ok to cover under floor heat, no esc this project
|
Electrical Rough-In | 4/12/2010 | 4/13/2010 | 4/13/2010 | A | FAIL |
Bob Reichert
|
|
|
Floor heat, call 30 minutes prior please. Inspection requested from web by: John VanZandt Phone #: ###-#### called, shall install per manfactures instructions for floor heat, told to recall, no esc
|
Electrical Rough-In | 3/29/2010 | 3/29/2010 | 3/29/2010 | P | PASS |
Doug A Poedy
|
|
|
Please call John 30 minutes prior to inspection @ 2###-#### Inspection requested from web by: John VanZandt Phone #: ###-####. Ok to cover bathroom.
|
Rough-In Permanent Service | 3/25/2010 | 3/26/2010 | 3/26/2010 | A | CANC |
Bob Reichert
|
|
|
John Phone #: ###-#### wrong type request, see ri
|
Electrical Rough-In | 3/26/2010 | 3/26/2010 | 3/26/2010 | A | FAIL |
Bob Reichert
|
|
|
John Phone #: ###-#### called ,NEC 210.11(C) bath receptacles shall be on 20A circuits, 300.14 shall provde min 6" free conductor length at boxes, no esc this project
|