Final | 6/1/2010 | 6/2/2010 | 6/2/2010 | A | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: Barbara Szurgot Phone #: ###-#### corrections made, ok to final, signed card
|
Final | 5/28/2010 | 6/1/2010 | 6/1/2010 | A | PART |
Bob Reichert
|
|
|
Inspection requested from web by: Barbara Szurgot Phone #: ###-#### did not sign t/o, needs considerable strapping, panel schedules, tie-wraps not acceptable for flex strapping
|
Electrical Rough-In | 5/17/2010 | 5/17/2010 | 5/17/2010 | P | PASS |
Bob Reichert
|
|
|
Ceiling inspection Inspection requested from web by: Barbara Szurgot Phone #: ###-#### ok to cover ceiling only
|
Electrical Rough-In | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | PASS |
Jack Frank
|
|
|
Ceiling inspection for media room. Call Steve to get in ###-#### Inspection requested from web by: Barbara Szurgot Phone #: ###-#### ok
|
Electrical Rough-In | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | PASS |
Doug A Poedy
|
|
|
Call Steve at ###-#### to let you in Inspection requested from web by: Barbara Szurgot Phone #: ###-####
|
Conference | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | DONE |
Doug A Poedy
|
|
|
Please call Doug at ###-#### so he can let you in. Thanks Inspection requested from web by: Barbara Szurgot Phone #: ###-####
|