Final | 6/24/2010 | 6/25/2010 | 6/25/2010 | P | PASS |
Bob Reichert
|
|
|
Final Swimming pool Inspection requested from web by: Lynn Cable Phone #: ###-#### ok
|
Final | 6/23/2010 | 6/24/2010 | 6/24/2010 | P | CANC |
Doug A Poedy
|
|
|
Final Swimming pool Inspection requested from web by: Lynn Cable Phone #: ###-####. rescheduled.
|
Electrical Rough-In | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | PASS |
Bob Reichert
|
|
|
Didn''t see that the inspection for the potting happened on the scheduled date of 27th. Want to make sure it gets done. pool is scheduled for water the 28th. I will hold them off till afternoon. Thanks Inspection requested from web by: Lynn Cable Phone #: ###-#### potting ok
|
Electrical Rough-In | 5/27/2010 | 5/27/2010 | 5/28/2010 | P | CANC |
Bob Reichert
|
|
|
Potting Compound Thanks Inspection requested from web by: Lynn Cable Phone #: ###-#### see 5-28-10 response
|
Electrical Rough-In | 3/28/2010 | 3/29/2010 | 3/29/2010 | A | PASS |
Bob Reichert
|
|
|
Pool Bonding & Underground Inspection Thanks Inspection requested from web by: Lynn Cable Phone #: ###-#### pool bonding and u/g to light only ok to cover
|