Final | 8/31/2010 | 8/31/2010 | 8/31/2010 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Idsinga ok final
|
Electrical Rough-In | 7/15/2010 | 7/15/2010 | 7/15/2010 | P | PASS |
Doug A Poedy
|
|
|
Greg-Floor heat Phone #: ###-####
|
Electrical Rough-In | 7/13/2010 | 7/13/2010 | 7/13/2010 | P | FAIL |
Bob Reichert
|
|
|
floor heat master bathroom-greg Phone #: ###-#### corrections not made, called, left correction notice as posted, fee due
|
Electrical Rough-In | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | FAIL |
Bob Reichert
|
|
|
greg - master bathroom floor heat Phone #: ###-#### called. left correction notice, NEC 110.3(B) shall install listed equipment per mfgr's instructions, NOTE: corrections shall be made within 5 working days or further action will be taken
|
Electrical Rough-In | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | PASS |
Doug A Poedy
|
|
|
service existing Inspection requested from web by: Greg Idsinga Phone #: ###-####
|
Electrical Rough-In | 4/21/2010 | 4/22/2010 | 4/22/2010 | A | NR |
Bob Reichert
|
|
|
Service is existing. Inspection requested from web by: Greg Idsinga Phone #: ###-#### needs to finish make-up, nail plates, add outlets, etc, fee due
|