Final | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot ok final
|
ELE-Aging Inspection | 1/20/2011 | 1/20/2011 | 1/20/2011 | | DONE |
Bob Reichert
|
|
|
suc
|
ELE-Aging Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | | DONE |
Bob Reichert
|
|
|
suc
|
Rough-In Permanent Service | 9/1/2010 | 9/2/2010 | 9/2/2010 | A | CANC |
Bob Reichert
|
|
|
Call Doug if you need security code Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot wrong type request, see ri
|
Electrical Rough-In | 9/2/2010 | 9/2/2010 | 9/2/2010 | A | PASS |
Bob Reichert
|
|
|
Call Doug if you need security code Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot met contractor, ri ok
|
Permanent Service | 4/14/2010 | 4/15/2010 | 4/15/2010 | A | PASS |
Bob Reichert
|
|
|
Gate code is #2036 and door code is 1931 Inspection requested from web by: Barbara Szurgot Phone #: ###-#### corrections made p/s u/g rec ok, no esc tjhis project
|
Permanent Service | 4/13/2010 | 4/13/2010 | 4/13/2010 | P | FAIL |
Bob Reichert
|
|
|
Gate code is #2036 Inspection requested from web by: Barbara Szurgot Phone #: ###-#### called, left correction notice, NEC 250.52 shall use interior water piping as part of grounding electrode system, 250.53(B) electrodes shall be 6' apart, 312,5 all conductors entering enclosure shall have abrasion protection, 110.12(A) unused openings shall be closed, BCC shall provide access to structure- code did not work, NOTE correctionsw shall be made in 5 working days, fee due, no esc this project
|
Temporary Service | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | CANC |
Bob Reichert
|
|
|
Power up existing service for temp Inspection requested from web by: Barbara Szurgot Phone #: ###-#### called contractor to change to p/s and told to recall once they get permits in order, also provide code for access next time, no esc this project
|