Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberELE10-00724
StatusFinaled
Name A M E ELECTRIC
Site Address 4215 W HILLCREST DR
Project Name 
Customer Number459 8959
ePlanReview 
Description
Electrical Permit - New: provide and install electrical for a new pump house.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/7/20107/8/20107/7/2010APASS
DetailsJack Frank
mike Phone #: ###-####
Rough-In Permanent Service6/25/20106/28/20106/28/2010APASS
DetailsJack Frank
ELLIOTT WILL BE THERE AROUND 8:00AM IF YOU NEED IN BEFORE PLEASE CALL MIKE AT ###-#### FOR DOOR CODE. Inspection requested from web by: Mike TenHulzen Phone #: ###-####
p/s u/g new ok
Electrical Rough-In6/15/20106/15/20106/15/2010PPASS
DetailsJack Frank
ROUGH COVER ELLIOTT IS ON THE JOB SITE. Inspection requested from web by: Mike TenHulzen Phone #: ###-####
ceiling ok
Electrical Rough-In6/11/20106/14/20106/14/2010AFAIL
DetailsBob Reichert
CEILING ROUGH COVER INSPECTION READY SERVICE READY ALSO EXCEPT SERVICE WIRE NOT PULLED TO THE IPCO TX YET. Inspection requested from web by: Mike TenHulzen Phone #: ###-#### met electricians, showed them that there shall not be over 4- 90 degree bends in conduit, no open boxes, no open re-bar at service, told to re-call when ready
Electrical Rough-In5/2/20105/3/20105/3/2010APASS
DetailsJack Frank
underground conduit to vault please call Mike with any questions @###-####. Inspection requested from web by: Mike TenHulzen Phone #: ###-####
Electrical Rough-In4/27/20104/28/20104/28/2010ACANC
DetailsDoug A Poedy
ROUGH COVER INSPECTION FOR THE ATTIC AND CONDUITS OUT TO THE GENERATOR. IF THERE ARE ANY QUESTIONS PLEASE CALL MIKE AT ###-####. Inspection requested from web by: Mike TenHulzen Phone #: ###-####.
Electrical Rough-In4/23/20104/23/20104/23/2010APASS
DetailsJack Frank
UG inspection to generator pad. Inspection requested from web by: Mike TenHulzen Phone #: ###-####
Electrical Rough-In4/12/20104/13/20104/13/2010APASS
DetailsBob Reichert
Jack, Dean went over and did a lot of straping,arranging, and rerouting. I reviewed the pictures and believe we have things fixed. Thank you. Inspection requested from web by: Jamie Winters Phone #: ###-#### corrections made, ok to cover u/g only
Electrical Rough-In4/9/20104/12/20104/12/2010AFAIL
DetailsJack Frank
Underground inspection prior to pouring concrete floor Inspection requested from web by: Jamie Winters Phone #: ###-#### called notice3 posted 310.15(2) (b) spacing for u/g conduits