Final | 5/5/2010 | 5/5/2010 | 5/5/2010 | A | PASS |
Jack Frank
|
|
|
thanks! Inspection requested from web by: Darryn Coburn Phone #: ###-####
|
Electrical Rough-In | 4/28/2010 | 4/28/2010 | 4/28/2010 | P | PASS |
Jack Frank
|
|
|
darrin - floor heat Phone #: ###-####
|
Electrical Rough-In | 4/28/2010 | 4/28/2010 | 4/28/2010 | A | FAIL |
Jack Frank
|
|
|
For Floor heat in master bathroom. Thanks Jack! Inspection requested from web by: Darryn Coburn Phone #: ###-#### called shall follow all manufacture's instructions
|
Electrical Rough-In | 4/27/2010 | 4/27/2010 | 4/27/2010 | P | FAIL |
Jack Frank
|
|
|
Darrin-floor heat in bathroom Phone #: ###-#### needs instructions at site
|
Rough-In Permanent Service | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | PASS |
Jack Frank
|
|
|
Darin ###-#### r/i p/s u/g new ok
|