Permanent Service | 6/28/2010 | 6/28/2010 | 6/28/2010 | P | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: daniel bibikov Phone #: ###-#### corrections made, p/s o/h rec ok
|
Final | 6/28/2010 | 6/28/2010 | 6/28/2010 | P | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: daniel bibikov Phone #: ###-#### ok to final
|
Final | 6/24/2010 | 6/25/2010 | 6/25/2010 | A | FAIL |
Bob Reichert
|
|
|
Inspection requested from web by: daniel bibikov Phone #: ###-#### not all corrections made, created 1 more violation, called, shall fix gfci, panel door shall open at least 90 degrees, told to recall when ready, fee due
|
Rough-In Permanent Service | 6/23/2010 | 6/24/2010 | 6/24/2010 | P | FAIL |
Bob Reichert
|
|
|
Inspection requested from web by: daniel bibikov Phone #: ###-#### left correction notice, NEC 110.3(B) listed or labelled equipment shall be used in accordance with instructions and also operate(recpt), 110,12(B) there shall be no broken parts(recpt), 110.26 shall provide work space and clearance per code section, 356.30 shall secure lfnc-b within 12" of box, 248.30 shall secure flex wihin 12" of box, BCC shall trace and utilize or abandon existing ground conductors, NOTE corrections shall be made within 5 working days or further action will be taken- such as removal of power
|
Rough-In Permanent Service | 5/13/2010 | 5/13/2010 | 5/13/2010 | P | FAIL |
Bob Reichert
|
|
|
Panel change out on outside Inspection requested from web by: daniel bibikov Phone #: ###-#### met contractor, needs to fix grounding, work clearance, abrasion protection, have house open for sub-panel
|