Final | 4/27/2010 | 4/29/2010 | 4/29/2010 | A | PASS |
Bob Reichert
|
|
|
Inspection requested from web by: Stuart Welton ok to final, no esc this project
|
Electrical Rough-In | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | CANC |
Doug A Poedy
|
|
|
Inspection requested from web by: Stuart Welton Phone #: ###-####
|
Permanent Service | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | PASS |
Doug A Poedy
|
|
|
Inspection requested from web by: Stuart Welton Phone #: ###-####. P/S O/H Reconnect ok. Still needs final.
|