Final | 5/13/2010 | 5/13/2010 | 5/13/2010 | P | PASS |
Doug A Poedy
|
|
|
Need final for renovation including grid ceiling cover Inspection requested from web by: Monty Adkinson Phone #: ###-####
|
DOC - Permit Finaled | 5/13/2010 | 5/13/2010 | 5/13/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 5/4/2010 | 5/4/2010 | 5/4/2010 | A | PASS |
Jack Frank
|
|
|
We need an inspection for wall cover only on our rough in, work above the grid ceiling is still happening. Inspection requested from web by: Monty Adkinson Phone #: ###-####
|
Conference | 4/26/2010 | 4/27/2010 | 4/27/2010 | A | DONE |
Doug A Poedy
|
|
|
Please call 1/2 hour ahead if possible. 8 to 9am is perferred. This is to review what wiring will be allowed to remain and what needs to be update. This is a request per phone conversation with the electrical inspector Doug P. Inspection requested from web by: Monty Adkinson Phone #: ###-####. Told them that nso much had to be redone that they needed to do complete job with commercial grade conduit and wire.
|