Final | 8/16/2010 | 8/16/2010 | 8/16/2010 | P | PASS |
Jack Frank
|
|
|
p/s final
|
ELE-Aging Inspection | 8/16/2010 | 8/16/2010 | 8/16/2010 | | CANC |
Jack Frank
|
|
|
|
Permanent Service | 6/15/2010 | 6/15/2010 | 6/15/2010 | P | PASS |
Jack Frank
|
|
|
Greg is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### p/s u/g new ok
|
Permanent Service | 6/7/2010 | 6/8/2010 | 6/8/2010 | A | FAIL |
Jack Frank
|
|
|
Greg is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### cakked correction not made still needs manufacture's listed neutal bar assembly
|
Permanent Service | 5/20/2010 | 5/20/2010 | 5/21/2010 | P | FAIL |
Jack Frank
|
|
|
Greg is the contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### called needs choke for GEC , needs grounded bus for new p/s disconnect, install conductors, shall not splice GEC in service 1 of 2
|
Electrical Rough-In | 5/11/2010 | 5/12/2010 | 5/12/2010 | P | PASS |
Jack Frank
|
|
|
Underground. If possible early afternoon. Contact is Mike his no is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### ok
|