Final | 7/2/2010 | 7/2/2010 | 7/2/2010 | A | PASS |
Bob Reichert
|
|
|
contact 30 minutes ahead for access. Inspection requested from web by: david bradshaw Phone #: ###-#### ok to final, no card to sign
|
Final | 6/16/2010 | 6/17/2010 | 6/17/2010 | A | PART |
Bob Reichert
|
|
|
Contact Carl Pettek. He will meet you onsite. Inspection requested from web by: david bradshaw Phone #: ###-#### need to see track lights in front, rest ok, corrections made, signed t/o card
|
Final | 6/15/2010 | 6/16/2010 | 6/16/2010 | A | FAIL |
Bob Reichert
|
|
|
Inspection requested from web by: david bradshaw Phone #: ###-#### called, left message, NEC 408.4 shall make panel schedule fully explanatory, BCC shall finish or blank stage receptacles, firmly attach plug mold, finisha stage lighting,upstairs receptacles shall operate, install seismic wires for fixtures, NOTE: corrections shall be made in 5 working days or further action will be taken
|
Final | 6/14/2010 | 6/15/2010 | 6/15/2010 | A | NH |
Bob Reichert
|
|
|
Inspection requested from web by: david bradshaw Phone #: ###-#### called, left card, fee due, will recall
|
Electrical Rough-In | 5/19/2010 | 5/19/2010 | 5/19/2010 | P | PASS |
Bob Reichert
|
|
|
Contact: Dave Bradshaw Inspection requested from web by: Scott Campbell Phone #: ###-#### ric ok
|