Final | 7/1/2010 | 7/2/2010 | 7/2/2010 | A | PASS |
Bob Reichert
|
|
|
Bathroom remodel and panel installation Inspection requested from web by: Steve Craig Phone #: ###-#### ok to final
|
Electrical Rough-In | 6/11/2010 | 6/11/2010 | 6/11/2010 | P | PASS |
Bob Reichert
|
|
|
Corrections are complete. Inspection requested from web by: Steve Craig Phone #: ###-#### corrections made, baths ok to cover
|
Electrical Rough-In | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | FAIL |
Bob Reichert
|
|
|
Rough in of bathrooms and electrical panel in new tenant space. Inspection requested from web by: Steve Craig Phone #: ###-#### called, gave corrections to provide nail plates, strap mc and provide 1 1/4" for flex, add mud ring, strap conduit at meter, fix and recall
|