Final | 6/10/2010 | 6/11/2010 | 6/10/2010 | A | PASS |
Jack Frank
|
|
|
Please inspect Bench has been removed and the Grounding is complete. Mark is our contact ###-#### Inspection requested from web by: Clint Tate Phone #: ###-####
|
Rough-In Permanent Service | 6/9/2010 | 6/9/2010 | 6/9/2010 | P | PASS |
Jack Frank
|
|
|
Please inspect the Meter/Panel on the South side of the house that we changed. Please call the Home Owner, Coleman at ###-#### to meet you at the house. Our Electrician that performed the work is Mark at ###-####. Please also perform a Final for this so that Idaho Power will turn the power back on for the customer today. Thank you. This home is occupied. Inspection requested from web by: Clint Tate Phone #: ###-#### address range and dryer recepts and pigtails, bond water to p/s remove bond from subpanel, workbench under subpanel shall be removeable p/s u/g rec. ok
|