Final | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot
|
Final | 7/30/2010 | 8/2/2010 | 8/2/2010 | A | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgo caalled correction clearence closet fixturest
|
Electrical Rough-In | 6/12/2010 | 6/14/2010 | 6/14/2010 | A | PASS |
Jack Frank
|
|
|
Inspection requested from web by: Barbara Szurgot Phone #: ###-####
|