Final | 6/17/2010 | 6/18/2010 | 6/18/2010 | A | PASS |
Jack Frank
|
|
|
Mike Phone #: ###-#### support boxes check gfci, install disconnect
|
Electrical Rough-In | 6/14/2010 | 6/15/2010 | 6/15/2010 | A | PASS |
Jack Frank
|
|
|
Potting compound inspection-Mike Phone #: ###-####
|
Electrical Rough-In | 6/8/2010 | 6/9/2010 | 6/9/2010 | A | PASS |
Jack Frank
|
|
|
Mike-Bonding and light inspection please Phone #: ###-####
|