Permanent Service | 9/14/2010 | 9/15/2010 | 9/15/2010 | P | CANC |
Doug A Poedy
|
|
|
virgik Phone #: ###-####
|
Final | 9/15/2010 | 9/15/2010 | 9/15/2010 | P | PASS |
Doug A Poedy
|
|
|
virgik Phone #: ###-####
|
Final | 9/13/2010 | 9/14/2010 | 9/14/2010 | A | CANC |
Doug A Poedy
|
|
|
Virgil Phone #: ###-####
|
Permanent Service | 9/14/2010 | 9/14/2010 | 9/14/2010 | P | PASS |
Doug A Poedy
|
|
|
Virgil Phone #: ###-####. P/S O/H Connect ok. Needs final on sub panel.
|
Conference | 8/4/2010 | 8/6/2010 | 8/6/2010 | P | DONE |
Jack Frank
|
|
|
Virgil Phone #: ###-####
|