Final | 9/9/2010 | 9/9/2010 | 9/9/2010 | P | PASS |
Bob Reichert
|
|
|
Final Inspection for the DA Davidson tenant space 18th Floor. Please Call Steve ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez ok final, signed card
|
Electrical Rough-In | 8/13/2010 | 8/13/2010 | 8/13/2010 | A | PASS |
Bob Reichert
|
|
|
Ceiling inspection. Please call Steve ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez ok ceilings only
|
Electrical Rough-In | 7/21/2010 | 7/23/2010 | 7/23/2010 | A | PASS |
Doug A Poedy
|
|
|
Steve-Only in the areas that are not in the plan modification review please Phone #: ###-####. Walls.
|