Final | 9/21/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate ok to final, no card to sign
|
Final | 9/16/2010 | 9/17/2010 | 9/17/2010 | A | PART |
Bob Reichert
|
|
|
Please contact our Wireman Rod at ###-#### at the site and he will escort you to the 2ND Floor. We would like a Final inspection for the work completed throughout the 2ND Floor with the exception of the Library. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate ok for all but library, panel signs, no card
|
Electrical Rough-In | 8/31/2010 | 9/1/2010 | 9/1/2010 | A | PASS |
Bob Reichert
|
|
|
We are ready to have the Ceiling Inspected throughout the 2ND Floor. Our Wireman on site is Rod at ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by Clint Tate ceiling except library ok
|
Electrical Rough-In | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | PART |
Bob Reichert
|
|
|
Ceiling Perimeter Phone #: ###-#### >> Inspection requested via web by Clint Tate ceiling borders north 1/2 2nd floor only ok
|
Electrical Rough-In | 7/20/2010 | 7/21/2010 | 7/21/2010 | A | PASS |
Doug A Poedy
|
|
|
Wall Phone #: ###-#### >> Inspection requested via web by Clint Tate
|