Final | 9/20/2010 | 9/21/2010 | 9/21/2010 | A | PASS |
Doug A Poedy
|
|
|
Final for service change Phone #: ###-#### >> Inspection requested via web by Emmet Bushman
|
DOC - Permit Finaled | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Permanent Service | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Emmet Bushman p/s o/h rec. ok
|
Permanent Service | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | FAIL |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Emmet Bushman. BCC requires grounding electrode conductor needs to be isolated from where it enters can. NEC 250.66 bonding. Need to increase size of wire to 1/0.
|
Conference | 8/9/2010 | 8/9/2010 | 8/9/2010 | P | DONE |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Emmet Bushman
|