Permanent Service | 9/1/2010 | 9/2/2010 | 9/2/2010 | A | PASS |
Jack Frank
|
|
|
Dan Phone #: ###-#### p/s o/h rec. ok
|
Final | 9/2/2010 | 9/2/2010 | 9/2/2010 | A | PASS |
Jack Frank
|
|
|
Dan Phone #: ###-####
|
Permanent Service | 8/27/2010 | 8/30/2010 | 8/30/2010 | A | FAIL |
Jack Frank
|
|
|
dan Phone #: ###-#### called correction needs 8ft clearence over patio roof
|
Final | 8/23/2010 | 8/23/2010 | 8/23/2010 | P | FAIL |
Jack Frank
|
|
|
dan Phone #: ###-#### called needs 8ft over patio roof, grd rod needs to be driven flush
|