Final | 9/23/2010 | 9/24/2010 | 9/24/2010 | A | PASS |
Jack Frank
|
|
|
bill Phone #: ###-####
|
Electrical Rough-In | 9/20/2010 | 9/20/2010 | 9/20/2010 | P | PASS |
Jack Frank
|
|
|
Bill jones Phone #: ###-####
|
Electrical Rough-In | 9/16/2010 | 9/17/2010 | 9/17/2010 | A | FAIL |
Jack Frank
|
|
|
Bill Jones Phone #: ###-#### corr. posted box fill , 6 free length, shall install all boxes and recess fixtures before r/i is requested
|
Conference | 9/2/2010 | 9/2/2010 | 9/2/2010 | P | DONE |
Jack Frank
|
|
|
peggy - after 2:30 please Phone #: ###-#### ok
|