Final | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Daryl DeGrange
|
|
|
ok final
|
Final | 11/4/2010 | 11/4/2010 | 11/4/2010 | P | PART |
Daryl DeGrange
|
|
|
The light fixtures we were waiting on for final are installed. Phone #: ###-#### >> Inspection requested via web by Steve Craig part final
|
Final | 10/28/2010 | 10/28/2010 | 10/28/2010 | A | PART |
Daryl DeGrange
|
|
|
rest ok waiting for fixtures
|
Conference | 10/27/2010 | 10/28/2010 | 10/28/2010 | A | DONE |
Daryl DeGrange
|
|
|
I will be there at 8:15 in the morning to label the panel. We are trying to get a temporary occupancy. Phone #: ###-#### >> Inspection requested via web by Steve C see part final
|
Electrical Rough-In | 10/25/2010 | 10/25/2010 | 10/26/2010 | P | CANC |
Bob Reichert
|
|
|
>> Inspection requested via web by Steve Craig see 10-26-10 response
|
Electrical Rough-In | 10/26/2010 | 10/26/2010 | 10/26/2010 | A | PASS |
Bob Reichert
|
|
|
Steve ok cover ceiling
|
Permanent Service | 10/20/2010 | 10/20/2010 | 10/21/2010 | P | CANC |
Bob Reichert
|
|
|
Steve Craig ###-#### see 10-21-response
|
Permanent Service | 10/20/2010 | 10/21/2010 | 10/21/2010 | A | PASS |
Bob Reichert
|
|
|
p/s, exst meter pak, n, ok
|
Permanent Service | 10/20/2010 | 10/21/2010 | 10/20/2010 | A | CANC |
Bob Reichert
|
|
|
Steve Craig ###-####
|
Electrical Rough-In | 9/20/2010 | 9/20/2010 | 9/20/2010 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Steve Craig called to change address, walls only ok to cover
|
Electrical Rough-In | 9/7/2010 | 9/8/2010 | 9/7/2010 | A | CANC |
Bob Reichert
|
|
|
Underlab conduit inspection Phone #: ###-#### >> Inspection requested via web by Steve Craig Inspection cancelled from web by: Steve Craig
|