Final | 10/7/2010 | 10/8/2010 | 10/8/2010 | A | PASS |
Bob Reichert
|
|
|
Doug, I made your 2 corrections, & ran a new 20 amp 120 volt circuit to the new kitchen receptacles, and cleaned up the bathroom wiring as you requested. I have trimmed out all that I had done and she will take it from here, so please Final me when you are finished. Thanks!!! Dan. Phone #: ###-#### >> Inspection requested via web by Dan Mitchell corrections made, ok final
|
Electrical Rough-In | 9/20/2010 | 9/24/2010 | 9/24/2010 | A | FAIL |
Doug A Poedy
|
|
|
This work is in the cottage behind the main house. We are completely done with our work so please final us when you are finished. Thanks!!! Dan. ###-#### Phone #: ###-#### >> Inspection requested via web by Dan Mitchell. Jetted tub gfci can not have screws through back of plastic box. Kitchen outlet spacing(NEC210.52). Back door needs light switches installed close to door. Kitchen receptacles need to be TR rated.(406.11)
|